Hello,
we have the following situation:
- MM scheduling agreement with tolerance of 10% for under and overdelivery, production supply "summarized JIT call" is set.
- KANBAN cycle has 1 empty container with a summarized JIT call for replenishment, quantity 10 pieces.
- ASN has been created with BORGR transaction, it contains: 1 line item for the material with delivery quantity 9 pieces, assigned to this line item is the JIT call with notified quantity 9 pieces as well.
My expectation was that the JIT call can be booked with 9 pieces as it is inside the 10% tolerance defined for the scheduling agreement. In addition, I expected the KANBAN container be set to full.
Instead, the following error message is given:
'Post GR' carried out without success (Message no. BORGR215) Because of previous error, dispatching is not possible for ID 0180573431 (Message no. /SPE/ID_HANDLING011) Inbound Delivery 0180573431 00010 (Message no. BORGR210) Total of the summarized JIT calls does not match the current delivery qty (Message no. BORGR540)
Changing the delivery quantity and the notified JIT quantity to 10 pieces, the goods receipt is booked correctly.
I only found the following notes that deal with tolerances but they are outdated, as we are using DIMP release 603:
https://service.sap.com/sap/support/notes/393421
https://service.sap.com/sap/support/notes/508215
Has anybody faced a similar problem or can help me with this?
Thanks!