Hi,
I have an Interlinking action which consists of 4 elementary actions - A1, A2, A3 & A4.
The problem is sometimes one of the actions fail (e.g. A3). In such a case the vehicle is updated with A1 and A2.
My requirement is if any action fails out of A2, A3 or A4, the actions done previously should be rolled back. If action A3 fails, action A1 and A2 should be rolled back.
If any of the interlinking action fails the vehicle should come back to the state where it was before triggering the Interlinking action.
Can we do this by way of config? or is there a development which can be done.
Looking forward to your expert advices.
Best Regards,
Rohit.